Case Study

Case study · Heat Pump · Watford

An office decarbonised in a week.

120kW air-source heat pump replacing four gas boilers, retrofit fan-coil distribution, no rent increase passed to tenants. SCOP 3.4 hit on commissioning.

120kW

Heat Pump Capacity

B to A

EPC Improvement

40%

Heating Cost Reduction

85%

Carbon Reduction

The Challenge

A 3-storey, 2,500m² multi-tenanted office building in Watford faced several interconnected challenges:

  • Ageing gas boilers approaching end of life (installed 2005)
  • MEES regulations requiring minimum EPC C by 2027
  • Corporate tenants demanding decarbonised buildings
  • Rising gas prices affecting operating costs
  • No on-site cooling - tenant complaints in summer

The building owner needed to replace the heating system while also addressing tenant demands for summer cooling. A like-for-like gas boiler replacement would not address EPC requirements or tenant expectations.

Our Solution

We designed a comprehensive air source heat pump solution providing both heating and cooling:

Heat Pump System

  • 3 x 40kW ASHP units - Cascade system for modular operation
  • Reversible operation - Heating in winter, cooling in summer
  • Buffer tank integration - Optimises compressor cycles
  • Weather compensation - Automatic temperature adjustment
  • Building management system - Integrated smart controls

Distribution System

The existing heating distribution was adapted for heat pump operation:

  • Fan coil units replaced with 4-pipe units for heating and cooling
  • Underfloor heating on ground floor retained (ideal for heat pumps)
  • New low-temperature radiators in some areas
  • Zone controls for individual tenant comfort

Technical Specifications

Heat Pump System

  • Manufacturer: Mitsubishi Electric
  • Model: CAHV P500YA-HPB (x3)
  • Heating capacity: 120kW
  • Cooling capacity: 115kW
  • COP heating: 4.2 (at 7°C ambient)
  • EER cooling: 3.8

Building Impact

  • Floor area: 2,500m²
  • EPC before: B (score 45)
  • EPC after: A (score 25)
  • Gas consumption: Zero
  • Carbon savings: 28 tonnes/year
  • Cooling added: Full building

Results

After the first full year of operation:

40%

Heating cost reduction

EPC A

Rating achieved

100%

Tenant retention

Financial Summary

  • Total investment: £95,000 (heat pumps, distribution upgrades)
  • Previous gas cost: £18,000/year
  • New electricity cost: £11,000/year (heating + cooling)
  • Net savings: £7,000/year
  • EPC improvement value: Estimated £150,000 asset value increase
  • Cooling revenue: Enabled service charge increase

Additional Benefits

  • Building now qualifies for green leases
  • Attracts ESG-focused corporate tenants
  • Future-proofed against gas boiler phase-out
  • Reduced maintenance vs old boilers
  • Summer cooling resolved tenant complaints

Building Owner Feedback

"The heat pump installation has transformed our building's market position. We've achieved EPC A ahead of any regulatory requirement, and the addition of cooling has eliminated summer complaints. Two prospective tenants specifically mentioned the building's sustainability credentials during their decision process."
— Property Owner