MCS Certified - Commercial Solar Specialists - Get a quote

Case Study

Case study · Warehouse · Bedford

250kW. 4.2-year payback. 18 months in.

A Bedford distribution centre with a flat roof and a 200,000 kWh annual draw. We modelled three array sizes and recommended the smallest that paid back inside five years — here’s why.

250kW

System Size

65%

Energy Offset

£42k

Annual Savings

4.2yrs

Payback Period

The Challenge

A major logistics company operating a 40,000 sq ft distribution warehouse in Bedford approached us with significant energy cost concerns. Their warehouse operations ran 18 hours a day, 6 days a week, with substantial electricity consumption for:

  • High-bay LED lighting throughout the facility
  • Refrigeration units for temperature-sensitive goods
  • Conveyor systems and material handling equipment
  • Office areas and staff facilities
  • Growing fleet of electric forklift chargers

Annual electricity costs exceeded £65,000 and were rising with energy price increases. The company also had corporate sustainability targets requiring a reduction in Scope 2 emissions.

Our Solution

After conducting a detailed site survey and energy analysis, we designed a 250kW rooftop solar PV system optimised for the warehouse's consumption profile:

System Design

  • 540 solar panels - High-efficiency 460W monocrystalline panels
  • East-West orientation - Maximised energy capture throughout the day, matching operational hours
  • Ballasted mounting - No roof penetrations required on the flat membrane roof
  • 3 string inverters - SolarEdge commercial inverters with panel-level optimisation
  • Remote monitoring - Real-time performance tracking and alerts

Installation Approach

The installation was completed over 3 weeks with zero disruption to warehouse operations:

  • Weekend crane lifts for panel delivery to roof
  • Installation work during daylight hours while operations continued below
  • Electrical work scheduled during shift changeovers
  • Full commissioning and grid connection within planned timeline

Technical Specifications

System Details

  • System capacity: 250kWp
  • Panel type: JA Solar 460W mono
  • Number of panels: 540
  • Inverter: SolarEdge SE100K (x3)
  • Mounting: K2 ballasted flat roof
  • Roof area used: 1,800m²

Performance

  • Annual generation: 225,000 kWh
  • Self-consumption rate: 92%
  • Grid export: 8%
  • CO2 offset: 52 tonnes/year
  • Performance ratio: 85%
  • System efficiency: 21.3%

Results

The system has been operational for over 12 months and has exceeded performance expectations:

£42,000

First year savings

65%

Electricity cost reduction

52 tonnes

CO2 avoided annually

Financial Summary

  • Total investment: £175,000
  • Annual savings: £42,000 (year 1)
  • Payback period: 4.2 years
  • 25-year return: £850,000+ in savings
  • System warranty: 25 years performance guarantee

Client Feedback

"The installation was completed on time and with no impact on our warehouse operations. The savings have exceeded our expectations, and we're now looking at adding battery storage to capture even more value from the system."
— Operations Director

Have a Similar Project?

Contact us to discuss how commercial solar can reduce your energy costs and carbon footprint.

Get a quote Call 07944 275171